BRIDGEPORT REGIONAL MARITIME COMPLEX
BRIDGEPORT, CT
Remediation and redevelopment of a 44-acre former steel mill situated on Bridgeport Harbor. The site was contaminated by previous land uses and covered with debris and foundations. Redevelopment initiative restored land to economic vitality and encouraged new, water-dependent industries. TPA Design Group prepared plans for a range of improvements including foundation removal; bulkheads and revetment; dredging of Yellow Mill Channel to facilitate access; new buildings; pier construction for a high-capacity mobile boat hoist; and filling to reduce flood hazard. Oversaw geotechnical and environmental investigations; assisted with permitting at the local, state and federal levels.
Awards:
2005 Engineering Excellence – Grand Award
American Council of Engineering Companies of Connecticut
2003 Development Award
Team Connecticut EDDY
2003 Estate Awards – Grand Prize
The Real Estate Exchange
Derektor Shipyards Drydock
Aerial NW View During Construction
Launch of NYC Water Taxi at Derektor Shipyards
Derektor Shipyards Drydock